Damn thats a cool looking setup
Damn thats a cool looking setup
That is an awesome looking build you have going on there.
As an update on my junk. Just installed the motor and trans, have to wire and plumb the car, then rewire some things that are being updated or back dated, then retune the car (going back to gas for awile),maybe head to the drag strip for a little testing, possibly beat on it a little on the dyno to see where I am at hp wise at the lower power levels I will be running for the next couple of races. Oh ya also have to rework ome of the ground effects for the smoother pavement.
So your saying like 2-2.5 days until completion?
Mike, the first time I ran Maxton, you went 237 rigth behind me - I couldn't figure out what I had done to fire up the crowd........you MADE A GREAT RUN!!!The Geezers can't wait to see you in Ohio!!!! We're off the dyno and in the car - check with Brian for details.
Our Best To You
Geo Turner
Can't wait to see the Evo back in action. Really dig that car.
Just hoping my big cube, big turbo turd will be running and hold together a full mile let alone run within 70mph of what that little 4 Popper can.
Thanks guys!
Joey probably more like 3 days. lol
The car has been running since monday, most of the rewiring is done. Need to finish the wiring and reinstall the intercooler, then switch fuels/ get the car tuned , then tested.
Times ticking down, anybody else ready to go?
As ready as I'm gonna be. But I have something to drive down the track and a class to put it in.
Dan
Dan, just don't forget there is a whole new book of open records to set