Just to give everyone a heads up, The Ohio River Bridge at Cairo Il is under construction and is heavily restricted.
So if you are pulling a trailer or over 17' seek an alternate route. This is adding about an hour and a half to a normally 4 hour ride for us.
Key Elements of the Work Zone include:
7-foot maximum load width
19-foot maximum vehicle length
No dual-wheeled vehicles
No trailers
Barrier walls for worker safety
24-hour police presence with strict work zone enforcement
7-foot maximum load width
19-foot maximum vehicle length
No dual-wheeled vehicles
No trailers
Barrier walls for worker safety
24-hour police presence with strict work zone enforcement